L3 — Estimator
The Estimator’s Job
Your scope is the blueprint and the paycheck in one document. Get it right and the job runs clean; get it wrong and someone eats the difference.
Where the scope lives in the workflow
When a job hits Estimate Received, Write Scope, the back office is notified to build the estimate. You write the scope in Roofr (retail bid or insurance bid), double-check it, and advance the job to Scope Written, Rep Review. After a rep verifies it, it becomes Rep Approved & Sent.
The mission
Your job is to make the proposal match the insurance estimate accurately — the right materials, the right quantities, the right labor — no more, no less. If the homeowner is skipping a line item, that must be noted on the file first.
Slight overage on material is acceptable. Being short is not. A short order stops a crew mid-job and costs a return trip. When in doubt, round up.
Knowledge Check
Pick your answer — you’ll see instantly if you’re right, and why.
1. After you write and double-check a scope, where does the job go?
2. When in doubt on a material quantity, you:
Squares, Bundles & Waste
Everything starts with the count. Confirm the squares on the insurance estimate, then do the math.
Squares to bundles
Adding waste
Waste covers cuts, hips, valleys, and complexity. The method:
- Start at the minimumDefault minimum waste is 5%.
- Calculate by complexityAdd up all the slopes and divide by 3 to get your waste percentage. More slopes = more cuts = more waste.
- Cap itMaximum waste is 15%. Slight overage is acceptable; being short is not.
A roof with 12 slopes: 12 ÷ 3 = 4% waste from complexity — but you’d still carry the 5% minimum. On a cut-up 30-slope roof: 30 ÷ 3 = 10%, still under the 15% cap.
Knowledge Check
Pick your answer — you’ll see instantly if you’re right, and why.
1. How many bundles are in a square of our standard architectural shingle?
2. How do you calculate waste percentage from complexity?
3. Maximum waste you’d add is:
Shingles, Ridge & Core Materials
Match the shingle to what was there, get the ridge right, and never miss a core component.
Shingle logic
Ridge
Check the insurance estimate for the ridge type — standard vs. high-profile — and fix it if it’s wrong. Confirm the linear footage, the coverage per bundle, and rounded quantities. Make sure there aren’t two different ridge types in the same estimate. Wrong ridge = unhappy homeowner.
Core materials — verify every one
Knowledge Check
Pick your answer — you’ll see instantly if you’re right, and why.
1. The existing roof is architectural. What do you scope?
2. On drip edge, what’s the common mistake to catch?
Accessories & Labor
Two places a scope quietly bleeds money: missed accessories and wrong labor.
Accessories — match the photos exactly
Open the latest accessory count photos and confirm every item is in the scope, in the right quantity:
If you’re unsure what an abbreviation means, check the Accessory List.
Labor — base unless proven otherwise
Don’t pad labor items on a hunch. Add them only when the file or photos confirm the condition — otherwise the proposal won’t match the estimate and it’ll bounce in review.
Knowledge Check
Pick your answer — you’ll see instantly if you’re right, and why.
1. How closely must accessory quantities match the count photos?
2. When do you add labor beyond base pricing?
Verify, Polish & Send
This is Rep Review — the last gate before it hits the homeowner. Proposal and estimate, side by side, every time.
The review flow
- 1. Confirm readiness & open both docsFile is in Scope Written – Rep Review. Open the proposal and the insurance estimate side by side and keep them there.
- 2. Quick total checkCompare the proposal total to the estimate total. Clearly off? Stop and investigate before going further.
- 3. Check the proposal layoutCover page (correct property), About Us, measurements, estimate, contract, and manufacturer brochures for every shingle offered.
- 4. Turn on detailed viewTemporarily enable quantities, unit prices, and subtotals so you can verify without editing unless needed.
- 5. Verify the numbersConfirm RCV, Depreciation, ACV. If there are multiple summary pages, add the totals together and enter the subtotal manually. Do not factor in profit percentages or markups — the proposal total should align with the insurance totals.
Remove the quantities, line-item amounts, and totals from the customer-facing proposal. Preview it, check for correctness and a clean, quality appearance. The homeowner sees a polished document, not your working numbers.
Send & advance
Confirm the correct template is selected, send to the homeowner, and verify the file auto-advanced to Rep Approved & Sent. Signature is now pending and checks are inbound. After signature and payment, handle mortgage endorsement if needed, or move to scheduling the install.
Knowledge Check
Pick your answer — you’ll see instantly if you’re right, and why.
1. When verifying the insurance numbers, do you add profit markup to match?
2. What do you do before sending the proposal to the homeowner?
3. After you send, the file should auto-advance to:
L3 Estimator Exam
8 questions · 80% to pass. Pick the best answer for each, then submit.
